Scope

Organised industrial zones, free zones and industrial zones are listed in the 18-month group. Assess the zone authority and the independent industrial activities within the zone separately. The zone certificate should not be assumed to discharge each plant’s obligations.

Source: Türkiye Water Efficiency Regulation — official Turkish PDF · Annex 1

Plan the field implementation

Meter zone inlets, wells, shared facilities and plot connections. Inventory existing meter outputs and network infrastructure. Distinguish reclaimed-water production from actual reuse and define interfaces with billing or central monitoring. Verify the rules applicable to meters used for billing.

Certificate criteria

Green: 5% of total water use from non-conventional sources. Turquoise: at least 25% of wastewater recovered and reused. The denominators differ. Rainwater, greywater, landscaping, training and sector guides also have to be considered.

Source: Türkiye Water Efficiency Regulation — official Turkish PDF · Article 7 / Annexes 4–5

Information for your quotation

Share your pipework, flow range, pressure conditions and existing automation. Product, installation and integration scope will be defined in the quotation.

Procurement guide