Define the boundary
Draw the facility, campus or network boundary first. Identify mains supply, wells, tanker deliveries and alternative sources; then separate process, domestic, irrigation and reuse lines. A difference between unmatched meter totals cannot reliably be labelled leakage. Account for reservoir storage changes and data uncertainty.
From measurement to decisions
- Main inlet: volume, instantaneous flow and time
- Submeters: building, plot or process use over the same interval
- Pressure points: upstream, downstream and critical service points
- Reuse: water produced and actually reused
- Data quality: gaps, replacements and clock alignment
Water loss is not identical to non-revenue water
Keep authorised consumption, physical/apparent losses and non-revenue water conceptually separate. Non-revenue water may include authorised unbilled consumption. For regulatory reporting, follow the required definitions and templates; for engineering assessment, record the assumptions and uncertainty.
Source: Türkiye Water Efficiency Regulation — official Turkish PDF · Articles 4–9 / Annexes 1–5